Close

Incoming Message

Watco UK

Protecting your premises since 1927

My Shopping Basket

(0 Items) £0.00

  • 01483 418 418
  • Live Help_

Watco Tack Coat Cold Cure

Watco Tack Coat Cold Cure

A cold curing version for use before screeding at low temperatures, available in 1m² & 6m² packs.

SKU# W090241

Be the first customer to give a product tip

From £16.00 Excl. VAT
Add Items to Cart

* Required Fields

Description
An epoxy adhesive primer, for use before screeding with Watco Concrex Cold Set between 0°C - 10°C.

  • Suitable for internal or external applications
  • Quick and easy to mix and apply
  • Concrex Cold Set can be applied in approx. 1 hour at 0°C or 45 minutes at °C
  • Can be applied over existing paint, but all poorly bonded paint must be removed and well bonded paint roughened to provide a key
  • Available in 1m² or 6m² packs

    Watco Tack Coat is an epoxy resin adhesive primer for use before screeding with Watco Concrex Cold Set.

    Application Video

  • Technical Specs
    Delivery Time (Days) standard
    Primer Required no
    Usage - Interior / Exterior interior or exterior
    Usage - Properties adhesive primer, used before screeding with Watco Concrex Cold Set
    Usage - Surfaces floor, wall, ramps, steps
    Max Operational Temp (deg C) 60
    Coverage (m² per litre) 1 or 6
    Application - Curing time (hours) 1 at 0 degrees
    Application - Pot time (hours) 0.5
    Application - Recommended Coats 1
    PREPARATION & APPLICATION

    Surface Preparation

    Concrete
    Ensure surface is clean, dry and free of all loose material. Watco Tack Coat may be applied over existing paint but all poorly bonded paint must be removed and well bonded paint roughened to provide a key. Check that there is no ice in the substrate.
    Metal
    Remove any loose or flaking material and rust by wire brushing or disc grinding. Oil or grease should be removed with Watco Bio D and the metal allowed to dry. Watco Tack Coat should be applied immediately after cleaning and drying.



    Mixing
    Pour the contents of the smaller tin into the larger tin and mix thoroughly with a wide bladed tool. When using the 6m² pack decant into a shallow tray. Do not leave mixed components in the tin - the product will quickly become unusable and the tin become hot. Use immediately, the pot life of the mixed components is 20 minutes maximum at 20ºC, less at higher temperatures.

    Application
    Apply sparingly by roller or brush and allow to become ‘tacky’. Overlaying must be completed while the Watco Tack Coat Cold Cure is still tacky. This product should be applied with temperatures of 0ºC - 10ºC.

    Quick Overview

    A cold curing version for use before screeding at low temperatures, available in 1m² & 6m² packs.

    Other people also bought the following product(s)


    Watco UK Ltd, Watco House, Filmer Grove, Godalming, Surrey GU7 3AL