Surface Preparation
Remove loose material and dirt. Apply a suitable fungicide solution to surfaces contaminated with moss or algae etc. Emergency repairs may be carried out in the wet but we recommend that the surface is as dry as possible if undertaking long term repairs or complete refurbishment.
Application
Apply at temperatures above 5°C. Stir well before use. One coat generously applied by brush or medium pile roller is generally sufficient.