Surface PreparationInspect entire surface to assess soundness of existing substrates or coatings. Where necessary prepare test areas. Repairs to cracks, holes, blisters etc, should be carried out before application of the coating. Ensure roof surface is clean, dry and free from all loose debris and roof contaminants. All fungal growth, moss etc. should be treated with a suitable fungicidal cleaner. General dirt and contamination can be removed with
Watco Bio D, a biodegradable solvent free degreaser.
Please Note: Watco Liquid Roof Membrane is
moisture activated, therefore once opened, all material must be used immediately. The tin cannot be re-sealed.
Application
Do not apply if rain is forecast within 12 hours. Stir contents thoroughly (do not thin). Apply Watco Liquid Roof Membrane by brush or short/medium pile type roller. Work material well into substrate. Apply generous amounts to areas at a higher risk of water ingress i.e. joints and protrusions with a brush prior to the application of the main coating. Two coats are recommended. The second coat should be applied after a minimum of 8 hours and a maximum of 7 days. An anti slip finish can be achieved by sprinkling the coarse white grit over the second coat while it is still wet.